HOW MANY PILE LOADER FILLS MAKE A FULL 30-TON TRUCK?
If you're in the business of sand, stones, or granites, or you're simply building, this is a question you’ve probably asked before 👷♂️:
How many pile loader buckets does it take to fill a 30-ton tipper truck?
🔍 Here’s the simple answer:
✅ On average, a standard pile loader bucket carries between 2.5 to 3 tons of material per scoop.
👉 So, to load a 30-ton truck:
30 tons ÷ 3 tons = 10 bucket fills
Or if the loader bucket is smaller (say 2.5 tons), it might take 12 fills.
But it doesn't stop there...
🛠️ Factors that can affect the number of fills:
The size and capacity of the loader bucket
The type of material (wet sand weighs more than dry)
How full the operator loads the truck
The truck’s actual capacity (some 30-ton trucks are slightly under or over, depending on model and loading limits)
💡 Why this matters: Knowing the number of fills helps with:
Accurate billing 📊
Preventing overloading fines 🚨
Better coordination between loader and truck operator 🤝
📢 Whether you're buying or supplying, always confirm the loader size and the agreed number of fills!
For accurate supply of sand, granite, chippings or stones, we load right and deliver on time 💯.
📞 Call 09163721031 today for your next construction delivery.